{"id":15687,"date":"2023-11-16T19:01:41","date_gmt":"2023-11-16T18:01:41","guid":{"rendered":"https:\/\/verkor.com\/?p=15687"},"modified":"2023-11-17T22:49:41","modified_gmt":"2023-11-17T21:49:41","slug":"verkor-marks-new-milestone-in-future-of-sustainable-mobility-laying-the-foundation-stone-of-its-gigafactory","status":"publish","type":"post","link":"https:\/\/verkor.com\/en\/verkor-marks-new-milestone-in-future-of-sustainable-mobility-laying-the-foundation-stone-of-its-gigafactory\/","title":{"rendered":"Verkor marks new milestone in future of sustainable mobility, laying the foundation stone of its Gigafactory"},"content":{"rendered":"<p><b><span data-contrast=\"auto\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290-300x200.jpg\" alt=\"1erre pierre Gigafactory Verkor\" width=\"872\" height=\"581\" class=\"alignnone wp-image-15689\" srcset=\"https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290-300x200.jpg 300w, https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290-1024x683.jpg 1024w, https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290-1536x1024.jpg 1536w, https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290.jpg 1620w, https:\/\/verkor.com\/wp-content\/uploads\/2023\/11\/DSC8793_1_edit_410669847361290-300x200@2x.jpg 600w\" sizes=\"auto, (max-width: 872px) 100vw, 872px\" \/><\/span><\/b><\/p>\n<p><b><span data-contrast=\"auto\">Dunkirk \u2013 16 November 2023 \u2013 Verkor, joined by the Prime Minister and other members of Government, laid the foundation stone of its Gigafactory aimed to produce low carbon, high-performance electric batteries for sustainable mobility. An event made possible by the European Commission\u2019s validation of French support of 659 million euros for Verkor&#8217;s development activities and direct and indirect support for the project of up to \u20ac600 million from the European Investment Bank, subject to final approval, as part of the \u20ac2 billion financing package announced by Verkor last September.<\/span><\/b><\/p>\n<p>In the presence of Prime Minister Elisabeth Borne, Minister of Energy Transition Agn\u00e8s Pannier-Runacher, Delegate Minister of Housing and President of the Urban Community of Dunkirk, Patrice Vergriete, President of the Hauts-de-France region Xavier Bertrand and Ambroise Fayolle, Vice-President of the EIB, Verkor officially inaugurated the construction of the Gigafactory located in Dunkirk. The event highlights Verkor\u2019s determination to advance quickly and concretely develop a European, resilient and sustainable battery value chain.<\/p>\n<p>Verkor\u2019s Gigafactory will be operational by 2025 with an initial production capacity of 16GWh\/year. Located in the Port of Dunkirk, it will contribute to the creation of approximately 1200 jobs and 3000 indirect jobs. The industrial project positions Verkor as a major partner for mobility and stationary storage players, developing high-performance, low-carbon batteries in Europe, in favour of the energy transition.<\/p>\n<p>The construction of this European production site for high-density, high-performance, low carbon batteries for electric vehicles and stationary storage is made possible through the financial support of multiple stakeholders.<\/p>\n<p>Last September, Verkor announced the company had secured 2 billion euros in funding through a Series-C of \u20ac850m, direct and indirect banking support for the project of up to \u20ac600m from the European Investment Bank (subject to final approval), and national subsidies of approximately \u20ac650m recently approved by the European Commission in the context of the state aid framework for research and development and innovation (RDI framework).<\/p>\n<p>The Hauts-de-France Region and the Urban Community of Dunkirk are also financing \u20ac60m and \u20ac30m respectively.<\/p>\n<p><b><span data-contrast=\"auto\">Benoit Lemaignan, CEO of Verkor<\/span><\/b><span data-contrast=\"auto\"> said: \u201c<em>Dunkirk was not chosen by chance. We can feel the creative energy of all the players involved in this project, inspiring us, and pushing us forward! Today marks a decisive step for Verkor, of course, but also for the European energy transition and the reindustrialisation of France. Providing thousands of jobs in France, the Verkor site will supply much more than just low-carbon batteries. The laying of this foundation stone is a concrete expression of our determination to accelerate the decarbonisation of transport by building a resilient and sustainable European battery value chain.<\/em>\u201d \u202f\u202f<\/span><span data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><strong><span data-contrast=\"auto\" xml:lang=\"FR-FR\" lang=\"FR-FR\">Patrice Vergriete, <\/span><span data-contrast=\"auto\" xml:lang=\"EN-US\" lang=\"EN-US\">Delegate Minister of Housing and President of the Urban Community of Dunkirk<\/span><\/strong><span data-contrast=\"auto\" xml:lang=\"FR-FR\" lang=\"FR-FR\"><span data-ccp-charstyle=\"Strong\">,\u202f<\/span><\/span><span data-contrast=\"auto\" xml:lang=\"FR-FR\" lang=\"FR-FR\"><span data-ccp-parastyle=\"Normal (Web)\">d<\/span><span data-ccp-parastyle=\"Normal (Web)\">e<\/span><span data-ccp-parastyle=\"Normal (Web)\">clar<\/span><span data-ccp-parastyle=\"Normal (Web)\">e<\/span><span data-ccp-parastyle=\"Normal (Web)\">s<\/span><span data-ccp-parastyle=\"Normal (Web)\">:<\/span><\/span><span data-contrast=\"auto\" xml:lang=\"FR-FR\" lang=\"FR-FR\"><span data-ccp-parastyle=\"Normal (Web)\"> <\/span><span data-ccp-parastyle=\"Normal (Web)\">\u201c<\/span><em>This investment marks an important step in the establishment of the French electric battery champion in our region, which alone will create 1,200 direct jobs by 2025. A symbol of the Dunkirk area&#8217;s renewed attractiveness since its official opening in February 2022, this project reinforces the development model we have been promoting since 2014 for a low-carbon industry of the future.<\/em><\/span><span data-contrast=\"auto\" xml:lang=\"FR-FR\" lang=\"FR-FR\"><span data-ccp-parastyle=\"Normal (Web)\">\u201d<\/span><\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><strong><span data-contrast=\"auto\" xml:lang=\"EN-US\" lang=\"EN-US\">Xavier Bertrand, President of the Hauts-de-France Region<\/span><\/strong><span data-contrast=\"auto\" xml:lang=\"EN-US\" lang=\"EN-US\"><span data-ccp-parastyle=\"Normal (Web)\"> said:<\/span><\/span><span data-contrast=\"auto\" xml:lang=\"EN-US\" lang=\"EN-US\"><span data-ccp-charstyle=\"Strong\">\u202f<\/span><span data-ccp-charstyle=\"Strong\">\u201c<\/span><\/span><span data-contrast=\"auto\" xml:lang=\"EN-US\" lang=\"EN-US\"><em>Verkor&#8217;s new site is very good news for the Hauts-de-France region. Because it will create jobs, of course, but also because it is recognition of our economic strategy and our commitment to Rev3, the third industrial revolution. Here, we manufacture batteries, but not only batteries. Here, we manufacture the future, we manufacture confidence, we manufacture optimism.\u00a0 This is the real challenge of this plant, the real challenge of the economic and industrial transformation of our region. But it&#8217;s also about job creation. In addition to the 60-million-euro investment to build the plant, the Region is also investing in training. 80 million for 2023 alone, with an original program called Electro&#8217;Mob that will enable us to meet this challenge. Welcome to Verkor<\/em><span data-ccp-parastyle=\"Normal (Web)\"><em> in Hauts-de-France<\/em>.<\/span><span data-ccp-parastyle=\"Normal (Web)\">\u201d<\/span><\/span><span data-ccp-props=\"{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}\">\u00a0<\/span><\/p>\n<p><b><span data-contrast=\"auto\">Ambroise Fayolle, Vice-President of the European Investment Bank <\/span><\/b><span data-contrast=\"auto\">said<\/span><span data-contrast=\"auto\">: <em>\u201cAs the European Union\u2019s Climate Bank, the EIB is fully committed to the promotion of an autonomous, strategic and competitive Europe. After the recent financing of several other electric battery projects like Northvolt\u2019s pioneer Gigafactory in Sweden, and the support of Verkor in the financing of its innovation centre in Grenoble, the EIB is proud to contribute to the construction of this new site of a budding, transformative automotive sector in the Hauts-de-France region. This support is further proof of our commitment in favour of European players, who, like Verkor, are slated to become leaders in this new ecosystem of clean, no-carbon mobility.\u201d<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dunkirk \u2013 16 November 2023 \u2013 Verkor, joined by the Prime Minister and other members of Government, laid the foundation stone of its Gigafactory aimed to produce low carbon, high-performance electric batteries for sustainable mobility. An event made possible by the European Commission\u2019s validation of French support of 659 million euros for Verkor&#8217;s development activities [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","_relevanssi_noindex_reason":"","footnotes":""},"categories":[21,5],"tags":[],"class_list":["post-15687","post","type-post","status-publish","format-standard","hentry","category-press-release","category-uncategorized"],"acf":[],"_links":{"self":[{"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/posts\/15687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/comments?post=15687"}],"version-history":[{"count":0,"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/posts\/15687\/revisions"}],"wp:attachment":[{"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/media?parent=15687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/categories?post=15687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/verkor.com\/en\/wp-json\/wp\/v2\/tags?post=15687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}